Our Projects
Projects for:
Energy Distribution System Operators
Expansion of the 400/110 kV Wierzbięcin substation – 2024
Modernisation of the PZ Kępice substation – 2024
Expansion of the 400/110 kV SE Dunowo substation – 2023/2024
Expansion of the 110/15 kV GPZ Słupsk Poznańska substation – 2022
Expansion of the 110/15 kV GPZ Żydowo substation – 2021
Expansion of the 110/15 kV GPZ Pieńkowo substation – 2021
Modernisation of earth fault compensation at the GPZ Bytów substation – 2019
Modernisation of the 110/15 kV GPZ Zaspa substation – 2020
Modernisation of earth fault compensation at the GPZ Lotnisko substation – 2019
Modernisation of earth fault compensation at the GPZ Brętowo substation – 2019
Modernisation of earth fault compensation at the GPZ Sopot Kamienny Potok substation – 2019
Replacement of compensation units at 110/15 kV substations carried out by Energa Operator S.A. – 2019–2020
Modernisation of internal power supply using Petersen compensation coils with automatic reactance control at the 110/15 kV substation, carried out by Energa Operator S.A. – 2020
Replacement of 110/15 kV power transformers together with associated infrastructure and modernisation of the MV switchgear at the GPZ, carried out by Energa Operator S.A. – 2020
Projects for:
Renewable Energy Sector
Budowa stacji energetycznej 110/20 kV – GPO Gamów – 2024 r.
Construction of a 110/20 kV substation – GPO Warblewo – 2023/2024
Construction of a 110/20 kV substation – GPO Proszówek – 2023/2024
Construction of a 110/20 kV substation – GPO Mierzyn – 2023/2024
Projects for:
Industry
Upgrading of the MV/LV substation supplying the Babord Production Plant in Rusko
Upgrading of the MV network at the STEICO S.A. Production Plant in Czarnków – 2023
Upgrading of the MV switchyard supplying the Polarica Sp. z o.o. Production Plant in Niemierzyn – 2023
Construction of a 110/10 kV substation to supply the STEICO S.A. Industrial Plant in Gromadka – 2022/2023
Construction of a 110 kV cable line supplying the STEICO S.A. Production Plant in Gromadka – 2022/2023
Modernisation of the MV/LV substation supplying the Laguna Sp. z o.o. Production Plant in Elbląg – 2023
Upgrading of the 110/10 kV substation supplying the STEICO S.A. production plant in Czarna Woda – 2022
Modernizacja sieci SN w Zakładzie Produkcyjnym STEICO S.A. w Czarna Woda – 2022 r.
Construction work
Construction and Project Supervision
Supervision of the installation of electrical power systems for PWiK in Olsztyn – 2021, currently in progres
Design, supervision and construction
Cogeneration
Prowadzenie nadzoru z ramienia inwestora nad realizacją instalacji elektroenergetycznych układu kogeneracyjnego 2 x 2.5MW GPEC Tczew w roku 2020/2021
Supervision, on behalf of the client, of the installation of electrical systems for the 3 MW combined heat and power plant for MPEC in Pruszcz Gdański, currently under construction.
Supervision of the installation of electrical systems for the 2 x 250kW cogeneration plant at the Olsztyn Wastewater Treatment Plant, to be completed in 2020.
Supervision of the installation of electrical systems for a 20MW cogeneration plant for ENGIE EC Słupsk in Słupsk (currently under construction).
Supervision of the installation of electrical systems for PWiK in Olsztyn (scheduled for 2021, currently under construction)
Design of electrical installations for a 1MW high-efficiency combined heat and power (CHP) plant in Rybnik in 2019.
Design of electrical installations for a 2 x 2.5MW high-efficiency combined heat and power (CHP) plant at GPEC Tczew Rokitki in 2020.
Design of electrical installations for a 3MW high-efficiency cogeneration system for MPEC in Pruszcz Gdański in 2020.
Design of a 2 x 4.5MW high-efficiency cogeneration system at the gas mine in OP Tuchola – currently under construction
Design of a high-efficiency 2 x 4.5 MW cogeneration plant at the gas mine in OP Bojarze – currently under construction
Conducting an analysis regarding the integration of 1 MW cogeneration units (8 high-efficiency cogeneration units) in Tczew into the Energa Operator S.A. system
Construction of a high-efficiency 2 x 4.5 MW combined heat and power plant at the OP Tuchola gas field – currently underway
Construction of a high-efficiency 2 x 4.5 MW combined heat and power plant at the OP Bojarze gas field – currently underway
Design, supervision and construction