Energy Distribution System Operators

Expansion of the 400/110 kV Wierzbięcin substation – 2024

Modernisation of the PZ Kępice substation – 2024

Expansion of the 400/110 kV SE Dunowo substation – 2023/2024

Expansion of the 110/15 kV GPZ Słupsk Poznańska substation – 2022

Expansion of the 110/15 kV GPZ Żydowo substation – 2021

Expansion of the 110/15 kV GPZ Pieńkowo substation – 2021

Modernisation of earth fault compensation at the GPZ Bytów substation – 2019

Modernisation of the 110/15 kV GPZ Zaspa substation – 2020

Modernisation of earth fault compensation at the GPZ Lotnisko substation – 2019

Modernisation of earth fault compensation at the GPZ Brętowo substation – 2019

Modernisation of earth fault compensation at the GPZ Sopot Kamienny Potok substation – 2019

Replacement of compensation units at 110/15 kV substations carried out by Energa Operator S.A. – 2019–2020

Modernisation of internal power supply using Petersen compensation coils with automatic reactance control at the 110/15 kV substation, carried out by Energa Operator S.A. – 2020

Replacement of 110/15 kV power transformers together with associated infrastructure and modernisation of the MV switchgear at the GPZ, carried out by Energa Operator S.A. – 2020

Projects for:

Renewable Energy Sector

Budowa stacji energetycznej 110/20 kV – GPO Gamów – 2024 r.

Construction of a 110/20 kV substation – GPO Warblewo – 2023/2024

Construction of a 110/20 kV substation – GPO Proszówek – 2023/2024

Construction of a 110/20 kV substation – GPO Mierzyn – 2023/2024

Projects for:

Industry

Upgrading of the MV/LV substation supplying the Babord Production Plant in Rusko

Upgrading of the MV network at the STEICO S.A. Production Plant in Czarnków – 2023

Upgrading of the MV switchyard supplying the Polarica Sp. z o.o. Production Plant in Niemierzyn – 2023

Construction of a 110/10 kV substation to supply the STEICO S.A. Industrial Plant in Gromadka – 2022/2023

Construction of a 110 kV cable line supplying the STEICO S.A. Production Plant in Gromadka – 2022/2023

Modernisation of the MV/LV substation supplying the Laguna Sp. z o.o. Production Plant in Elbląg – 2023

Upgrading of the 110/10 kV substation supplying the STEICO S.A. production plant in Czarna Woda – 2022

Modernizacja sieci SN w Zakładzie Produkcyjnym STEICO S.A. w Czarna Woda – 2022 r.

Construction work

Construction and Project Supervision

Supervision of the installation of electrical power systems for PWiK in Olsztyn – 2021, currently in progres

Design, supervision and construction

Cogeneration

Prowadzenie nadzoru z ramienia inwestora nad realizacją instalacji elektroenergetycznych układu kogeneracyjnego 2 x 2.5MW GPEC Tczew w roku 2020/2021

Supervision, on behalf of the client, of the installation of electrical systems for the 3 MW combined heat and power plant for MPEC in Pruszcz Gdański, currently under construction.

Supervision of the installation of electrical systems for the 2 x 250kW cogeneration plant at the Olsztyn Wastewater Treatment Plant, to be completed in 2020.

Supervision of the installation of electrical systems for a 20MW cogeneration plant for ENGIE EC Słupsk in Słupsk (currently under construction).

Supervision of the installation of electrical systems for PWiK in Olsztyn (scheduled for 2021, currently under construction)

Design of electrical installations for a 1MW high-efficiency combined heat and power (CHP) plant in Rybnik in 2019.

Design of electrical installations for a 2 x 2.5MW high-efficiency combined heat and power (CHP) plant at GPEC Tczew Rokitki in 2020.

Design of electrical installations for a 3MW high-efficiency cogeneration system for MPEC in Pruszcz Gdański in 2020.

Design of a 2 x 4.5MW high-efficiency cogeneration system at the gas mine in OP Tuchola – currently under construction

Design of a high-efficiency 2 x 4.5 MW cogeneration plant at the gas mine in OP Bojarze – currently under construction

Conducting an analysis regarding the integration of 1 MW cogeneration units (8 high-efficiency cogeneration units) in Tczew into the Energa Operator S.A. system

Construction of a high-efficiency 2 x 4.5 MW combined heat and power plant at the OP Tuchola gas field – currently underway

Construction of a high-efficiency 2 x 4.5 MW combined heat and power plant at the OP Bojarze gas field – currently underway

Design, supervision and construction

Others

Supervision of the installation of electrical power systems for PWiK in Olsztyn – 2021, currently in progress

A project for the construction of five commercial buildings – three large-format retail outlets, a retail building housing a Biedronka supermarket, and a KFC food court – together with site development, internal road layout, parking spaces and technical infrastructure as part of the construction of the Siedlce Retail Park complex.

Project for the refurbishment of the T-1779 “PG-1” subscriber transformer and distribution station at Gdańsk University of Technology (replacement of MV and LV switchgear)

Project for the electrical installation in the “Carbon” production and storage hall on Leszno Street in Przasnysz for KROSS S.A.

Modernisation of the power supply system – MV and LV networks – at the Academy of Physical Education and Sport in Gdańsk (Akademia Wychowania Fizycznego i Sportu, Gdańsk)

Execution of construction works for the extended scope of works under the project: “Revitalisation and modernisation of the so-called ‘Kościerzyna railway corridor’ – the Kościerzyna-Gdynia section of railway line No. 201”, co-financed by the Regional Operational Programme for the Pomeranian Voivodeship for the years 2007–2013. The section connecting the PKM line to railway line No. 201 – from km 184.400 to km 188.100 (construction of a 15 kV MV cable line, a pole-mounted transformer substation, and 0.4 kV LV cable lines)

Supply of LV-0.4 kV switchgear for transformer substations ST-27, ST-38, ST-44, ST-45a, ST-50, ST-56, ST-88, ST-Calvert and ST-KOL for the 12th Regional Airport Branch

Supply of 0.4 kV low-voltage switchgear for the office, service and retail complex in Sopot at 5 Dworcowa Street (Sopot Centre)

Adaptation of the metering system to the change of electricity supplier at the Municipal Heating Plant in Malbork